Q: Will Rebug 4.82 downgrade to Rebug 4.81.2? ...
A: Yes, you can do it
Q: How do I do it?
A: If you have used Rebug 4.82, you should replace with firmware Ferrox 4.82 first.
Download :
STEP 1 Change Firmware Rebug to Ferrox
- Create PS3 directory then inside it UPDATE directory in fat32 Flash disk USB copy Ferrox CFW PUP file and rename it to PS3UPDAT.PUP
- Connect the flash to your PS3then go to SETTING then UPDATE SYSTEM
- Chose UPDATE VIA STORAGE MEDIA
- Take a coffe and wait the instaltion
STEP 2 Install Toggle QA
- Install Toggle QA.pkg
- Run Toggle QA
- Go To Settings & Hover Over Network Settings.
- Press and Hold In Order: L1, R1, L2, R2, L3, D-pad Down
- and restart your console
STEP 3 Install SEN Enabler
- Install SEN Enabler.pkg
- Run SEN Enabler
- Chose SEN/PSN Options/Restore default spoof and restart console
STEP 4 Last, Downgrade firmware
- Same as step 1
- Create PS3 directory then inside it UPDATE directory in fat32 Flash disk USB copy Rebug 4.81.2 CFW PUP file and rename it to PS3UPDAT.PUP
- Connect the flash to your PS3then go to SETTING then UPDATE SYSTEM
- Chose UPDATE VIA STORAGE MEDIA
- Done.
Video Tutorial


No comments:
Post a Comment