Download Dark Souls III The Ringed City PC Download Dark Souls III The Ringed City PC - MSProx

Download Dark Souls III The Ringed City PC

GAME NAME
DARK SOULS 3 The Ringed City
LANGUAGE
Multi
RELEASE DATE
2017
GENRE
RPG
SIZE
25 Gb

Info


The Ringed City is the final DLC pack for Dark Souls III – an award-winning, genre-defining Golden Joystick Awards 2016 Game of the year RPG. Journey to the world’s end to search for the Ringed City and encounter new lands, new bosses, new enemies with new armor, magic and items. Experience the epic final chapter of a dark world that could only be created by the mind of Hidetaka Miyazaki. A New World. One Last Journey.

As fires fade and the world falls into ruin, journey into a universe filled with more colossal enemies and environments. Players will be immersed into a world of epic atmosphere and darkness through faster gameplay and amplified combat intensity. Fans and newcomers alike will get lost in the game hallmark rewarding gameplay and immersive graphics. Now only embers remain.

This Release Includes:

• Dark Souls III (main game)
• Dark Souls III: Ashes of Ariandel (DLC)
• Dark Souls III: The Ringed City (DLC)

System Requirements


Minimum:
• OS: Windows 7 SP1 64bit, Windows 8.1 64bit Windows 10 64bit
• Processor: Intel Core i3-2100 / AMD® FX-6300
• Memory: 4 GB RAM
• Graphics: NVIDIA® GeForce GTX 750 Ti / ATI Radeon HD 7950
• DirectX: Version 11
• Network: Broadband Internet connection
• Storage: 25 GB available space
• Sound Card: DirectX 11 sound device

Recommended:
• OS: Windows 7 SP1 64bit, Windows 8.1 64bit Windows 10 64bit
• Processor: Intel Core i7-3770 / AMD® FX-8350
• Memory: 8 GB RAM
• Graphics: NVIDIA® GeForce GTX 970 / ATI Radeon R9 series
• DirectX: Version 11
• Network: Broadband Internet connection
• Storage: 25 GB available space
• Sound Card: DirectX 11 sound device



Link Download

Link 1 Gb x 27 File - Dark Souls III The Ringed City CODEX 

Install:
1. Extract
2. Burn or mount the .iso
3. Run setup.exe and install
4. Copy crack from CODEX dir to installdir
5. Play

Full List of Supported Languages:

English, French, Italian, German, Spanish, Polish, Russian, Portuguese-Brazil, Simplified Chinese, Traditional Chinese, Japanese, Korean

Notes: this release is standalone and also includes the previously released Ashes of Ariandel DLC.

General Notes:
• Block the game’s exe in your firewall to prevent the game from trying to go online ..
• If you install games to your systemdrive, it may be necessary to run this game with admin privileges instead



No comments:

Post a Comment

Theme images by ULTRA_GENERIC. Powered by Blogger.