GAME NAME
Call of Duty Black Ops 2
LANGUAGE
US + EUR
RELEASE DATE
November 13, 2012
GENRE
Third-Person, Shooter
VER
BLUS31011
BLES01717
BLES01718
BLES01717
BLES01718
SIZE
21,6 Gb
INFO
Call of Duty Black Ops 2: An entry into the blockbuster first-person shooter franchise, Call of Duty: Black Ops II brings players back into the shadows for another Black Ops mission assignment. Rooted in near-future fiction, Black Ops II propels players into warfare in an epic single player campaign highlighted by branching storylines and non-linear missions. A re-imagined multiplayer suite introduces players to some of the most cutting-edge weaponry and equipment that 2025 will have to offer. And on the outskirts of the campaign is an all-new Zombies experience running in the multiplayer engine.
Download Link
Link Mega EUR – BLES01718 : Download
++----------------------------------------------------------------------++
Link Google EUR – BLES01717 : Part 1 – Part 2
++----------------------------------------------------------------------++
Link Google USA – BLUS31011 : Download (password: vn-sharing.net)
Link All DLC (BLUS31011): Download
++----------------------------------------------------------------------++
Link Google EUR – BLES01717 : Part 1 – Part 2
++----------------------------------------------------------------------++
Link Google USA – BLUS31011 : Download (password: vn-sharing.net)
Link All DLC (BLUS31011): Download
Screenshot
Gameplay

No me abre el blus31011
ReplyDeleteHi great readinng your post
ReplyDelete