GTA 5 ONLINE - BEST MOD MENU - SEMJASES V1.6 SPRX [PS3/1.27/BLES/CEX/DEX] GTA 5 ONLINE - BEST MOD MENU - SEMJASES V1.6 SPRX [PS3/1.27/BLES/CEX/DEX] - MSProx

Latest News

GTA 5 ONLINE - BEST MOD MENU - SEMJASES V1.6 SPRX [PS3/1.27/BLES/CEX/DEX]


NOTE
OPEN MENU R3+LEFT
EBOOT contains
  • Support: DEX/CEX-BLES
  • Ver: 1.6
  • Compatible with all Paid or free sprx DEX/CEX-BLES
Feature
  • Anti-Report
  • Anti-FreezeBG.rpf/ No more freeze when you open script menu
  • Anti-CheckMPPLY
  • Anti-Animation
  • Anti-PFX
  • Money Drop Bypass
  • Object Bypass
  • Script Bypass
  • Anti-RemoveWeapons
  • Anti-GiveWeapons
  • Anti-VoteKick
  • Anti-Facebook MSG
  • Anti-CheckCash
  • No RockstarIntro
  • Anti-Clear Task/ Freeze Tasks
  • Anti-Explosion / Anti Explosion from other modders
  • Anti-Time Out / Fixed some problems in EBOOT Ver 1.6
  • Anti-Get MacAddress
  • Anti-Error Server
  • Anti-Check Stats
  • Unlock Online in Prologue 1.6
  • Fixed All problems in EBOOT Ver 1.6
Link Download 
 

11 comments:

  1. How to install ''TMP:Semjases V 1.6 ...?

    ReplyDelete
    Replies
    1. If you use Multiman you will need a USB flash drive.
      Plug the USB stick into your computer.
      Move the SPRX and EBOOT.bin to your USB.
      Eject the USB stick out of the computer.

      Now, plug the USB into the PS3.
      Head over to Multiman and scroll all the way to the left.
      Now, go to File Manager / mmOS.

      Now double-click on PS3 Root. A folder will pop up.
      Double click on dev_usb
      Open a new PS3 Root folder
      On the new folder, you're gonna want to open dev_hdd0, scroll down and head to tmp.

      Once you're inside dev_hdd0/tmp, go to the folder where you opened dev_usb.
      Press circle on the sprx and semjases folder
      Click copy.
      Go back to dev_hdd0/tmp and press cirlcle on an empty place (for example where it says Free Space) and then click Paste.

      Now you wanna go back to dev_usb and copy the EBOOT.bin.
      Go to dev_hdd0 and click on game. Now you should have /dev_hdd0/game in your upper left corner on the folder. Click on BLES01807, then usrdir and replace the EBOOT.bin with the one you copied by pasting it.

      Delete
  2. I put this in on cex but don't work

    ReplyDelete
    Replies
    1. You can convert your PS3 CEX to DEX [Click here](http://msproject-x.blogspot.co.id/2017/11/convert-cex-to-dex-ps3-cfw-4812.html)

      Delete
  3. Replies
    1. yes, this works and you should use ferrox or rebug firmware

      Delete
  4. Is semjames menu has any protection from being freezed from other modders.

    ReplyDelete
  5. yes you can do it

    ReplyDelete
  6. The other way of PS3 red screen fix is to reformat your PS3 hard drive. There is high possibility that your PS3 hard drive has been corrupted which causes red screen. Best PS4 Steering Wheel 2019

    ReplyDelete
  7. I have been looking to discover a solace or powerful Best ps4 steering to finish this procedure and I think this is the most reasonable approach to do it viably.Best ps4 steering wheel 2019

    ReplyDelete
  8. Precisa usar a Update.rpf original do game ? Pq tá dando tela preta sempre que entro no jogo e trava o game

    ReplyDelete

Theme images by ULTRA_GENERIC. Powered by Blogger.